10-10-2014, 11:53 AM
Abstracts: The Aim of this study describes and evaluates various solutions to existing blower assembly and incentives to use alternative methods in case of the failure of blower. The assembly of a blower is such that in case of failure the time taken for the replacement of motor or impeller is more. So by making various changes in assembly this problem can be solved. With this project we aim to find a more optimal solution to the existing blower assembly. It is very necessary to consider the time value of money in any project or production phase. The overall development of any firm vitally depends on this factor. So with this project we would also try to minimize the time consumption in case of the failure of a blower.