Abstracts: Non Value Adding times in fabrication process consumes much time than required, which affects productivity of process. Material needed to be transferred from one machine to another machines by means on EOT crane or Hydra crane, which consumes extra time due to availability problem and improper layout. Also set-up time, material quantity & complexity of process add Non Value adding time. In current position of company layout, CNC drilling machine is far away from fabrication department that’s why loading & unloading problem arise so, we decide to arrange CNC drilling machine in fabrication department in proper order to solve loading and unloading problem.In current position of company, company use EOT crane for loading & unloading of material in bending machine but EOT crane can’t take greater angular movement. If jib crane is use instead of EOT crane then 360° angular rotation is possible so that material handling become easy.