06-05-2012, 09:06 PM
give me the ppt of automatic railway gate control and track switching
06-05-2012, 09:06 PM
give me the ppt of automatic railway gate control and track switching
07-05-2012, 09:51 AM
to get information about the topic "Automatic Railway Gate Control and Track Switching " full report ppt and related topic refer the link bellow
https://seminarproject.net/Thread-automa...ull-report https://seminarproject.net/Thread-automa...ort?page=2 https://seminarproject.net/Thread-automa...ort?page=4
27-06-2013, 02:52 PM
AUTOMATIC RAILWAY GATE CONTROL AND TRACK SWITCHING
AUTOMATIC RAILWAY GATE.pptx (Size: 39.72 KB / Downloads: 30) ABSTRACT The objective of this paper is to providean automatic railway gate control at a levelcrossing and track switching at a junction. Itdeals with two things. Firstly, it deals with thereduction of time for which the gate is beingkept closed. And secondly ,to provide safety tothe road users and the trains by reducing theaccidents.By the presently existing system once thetrain leaves the station, the stationmaster informs the gatekeeper about the arrival of thetrain through the telephone. Once the gatekeeper receives the information, he closes the gatedepending on the timing at which the trainarrives. Hence, if the train is late due to certainreasons, then gate remains closed for a long timecausing traffic near the gates.By employing the automatic railway gatecontrol at the level crossing, the gate is closedautomatically whenever the train comes and gateis opened after the train leaves the levelcrossing. The arrival of train in either directioncan be identified using sensors placed on either side of the track. Use of embedded technologymakes this closed loop feedback control systemefficient and reliable. Micro controller (AT89C51) allows dynamic and faster control.Liquid crystal display (LCD) makes the systemuser-friendly. In case of track switching, twosensors are placed at the either sides of the junction where the track switches. If there is atrain approaching from the other side, thenanother sensor placed along that direction getsactivated and will send an interrupt to thecontroller. The interrupt service routine switchesthe track.As the system is completely automated, itavoids manual errors and thus provides ultimatesafety to road users. The mechanism works on asimple principle and there is not much of complexity needed in the circuit.
23-10-2014, 01:39 PM
automatic railway gate control and track switching project i need a output simulation using matlab please help me
gove me a output for this project using matlab simulation
24-10-2014, 10:48 AM
To get full information or details of Automatic Railway Gate Control and Track Switching please have a look on the pages
https://seminarproject.net/Thread-automa...ull-report https://seminarproject.net/Thread-automa...ort?page=2 if you again feel trouble on Automatic Railway Gate Control and Track Switching please reply in that page and ask specific fields in Automatic Railway Gate Control and Track Switching |
|