11-11-2014, 09:57 AM
Abstracts: I have been assigned for project named as Automatic Transformer Protecting and cooling system. The main significant of this project is that to study about main drawbacks emerging during over temperature of Transformer oil. Due to the failure of the Transformer there is all electrical breakdown accord in the all over plant. Out of many problem we selected How to monitoring the temperature of the transformer oil. Which is caused due to wear out because of the fault and some atmospheric effect. Due to Internal fault of the transformer and impact the effect of the external atmosphere the temperature of the transformer oil is increase and it may be damage the insulator and also may be winding of the transformer and cause the failure of transformer. The project consists of following sub project phases: observation, collection of data, analysis of data, result and conclusion.