Active Networking Equipment:
• All active networking equipment is to be from Cisco Systems
• MDF is to include 1 Cisco router with 3 Fast Ethernet interfaces and T1 interface providing access to the Internet
• All Backbone (fiber) terminations are to terminated on 100/1000 switch ports, all other (copper) terminations are terminated at 10/100 Mbps switch ports.
• All wiring closets are to have at least 10% growth capacity without purchasing additional patch panels or switch ports
• All active networking equipment to be rack mounted
• All network equipment to have battery backup (not necessarily rack mounted, though preferred)
Deliverables:
Fixed- Price Cost Proposal including:
• Detailed Bill of Materials (qty, description, mfg p/n, list price, discounted price, line item totals, total materials costs)
• Total Labor Cost (Guestimate: # of people it takes to do the job, # of days, hourly rate, ect… )
• Total Project Cost
Detailed Design Package (hard copy and electronic format) to include:
• Detailed IP addressing scheme (Subnet using Public IP network 200.100.12.0/24)
• Detailed wire maps
• Detailed cut sheets
• As-built documentation package including test results