30-05-2012, 05:17 PM
REgONISATION OF SINGLE PHASE Electricity stealing USING GSM
REgONISATION OF SINGLE PHASE stealing USING.pptx (Size: 957.93 KB / Downloads: 33)
ABSTRACT
The power distribution monitor is an important research in electric power system, and electricity-stealing defense is one of the chief steps in distribution network reconstruction.
Electricity-stealing is a long term problem,however,each power supply department has made huge investments of manpower and material, the phenomenon of defending stealing electricity has increased and not abated, and the method of electricity-stealing is continuously improved.
ROM
OTP – One Time Programmable Memory
PROM – Programmable Read Only Memory
EPROM – Erasable Programmable Read Only Memory
EEPROM – Electrical Erasable Programmable Read Only Memory
Uses: This is only Read process,
Not possible in Write Process.
RAM ( Random Access Memory )
Flip Flop Static also Advantages in Ram
Flip Flop is one bit
Uses : It is Read & Writing Process
It is also Rewritable process
EXISTING SYSTEM
The Stealing of electricity can be known only at the time when demand increases.
It is unable to provide us the indication about stealing in accurate.
Hence in early years, the power theft can be identified through manually and it was so difficult for overlooks the theft.