10-10-2014, 11:55 AM
Abstracts: Every big construction is depending upon the test result done prior to it. If the test result would be wrong, the construction would also be wrong. Wrong construction result great loss of economic as well as life also. In construction major work is made up of cement. Before every test on any sample made up of cement, curing of the sample is necessary. Without curing the cement will not become strong and durable or we can say that it will not gain it required strength. So our aim is to design and develop a year around refrigeration system for curing tank. In which the sample can be store in any kind of atmosphere and temperature.