Abstracts: Tower is the most critical component of transmission line. Power projects are highly capital intensive. Transmission line is the vehicle for optimum utilization of power produced at power projects. In the present project analysis of design members has been done of each member using key design variables. The comparison of calculated values and ANSYS values is done to see the variation. Optimization is a very important aspect for any engineering subject. Tower has the highest economic impact on the transmission line business so optimization is very important aspect which is done in the project.