02-08-2013, 02:07 PM
MAJOR PROJECT REPORT ON PIZZA MANAGEMENT SYSTEM WITH VISUAL BASIC
PIZZA MANAGEMENT .doc (Size: 2.31 MB / Downloads: 61)
ANALYSIS AND DESIGN
The design of the information system produces the details that state how a system will meet requirements identified during system analysis. System specialists often refer to this stage as logical design, in contrast to the process of developing program software, which is referred to as physical design.
System analysis begins the process by identifying reports, the requirements and output needed by the system. Then the specific data on each are pinpointed. Usually, designers’ sketch the form of display as they expect from the system. This can also be done on paper of on the computer display with the help of the automated system tools available.
The system design also describes the data to be input, calculated of stored. Individual data items and calculations procedures are written in detail. The procedures tell bow to process the data and produce the output. Designers are responsible for providing programmers with complete and clearly outlined software specifications.
DESIGN OBJECTIVES:-
The following goals were dept in mind while designing the new system;
To reduce the mutual word required to be done in the existing system.
To avoid errors inherent works and hence make the outputs consistent and correct.
To improve the management of permanent information to the company be keeping it in properly structured tables and to provide facilities to update this information as efficiently ad possible.
To make the system completely menu-driven and hence user –friendly. This was necessary so that even non-programmers could use the system effectively and system could act as catalyst in achieving objectives.
To make the system compatible i.e. it should “fit in” the total, integrated system.
To make the system in such a way that reduced future maintenance and enhancement times and efforts.
To make the system reliable, understandable and cost effective.
BENEFITS OF COMPUTERIZATION
There are lot of difficulties and bottlenecks in the current manual system. After the computerization of registration of the student. The problem can be removed to a great extent, for example:-
1. Response time will be reduced i.e. time taken to complete any inquiry will be reduced resulting in reduced waiting time.
2. The workload of the staff is currently more, it will be reduced.
3. Improved user satisfaction.
4. Easy access of record.
5. Security and secrecy of records
Objectives of the proposed system
The function of student record management system is an essential part of any college. The objective of this system is to keep track, records & maintain strict control over proper maintenance and security of students’ records. This system is designed with the purpose, that it should be useful to the keeping student’s records management system of a college.
CONCLUSION
Based upon the above analysis of present project we can work out through three major conclusions regards to:
1. Merits of Student record management system.
2. Limitations of student record management system.
3. Scope of further study.
Risk Management
Risk management is an emerging area that aims to address the problem of identifying and managing the risk associated with the software project. The basic motivation of having this is to avoid heavy losses or disasters. It is very important particularly of large project. The project has no major hazards associated with is. The only risk has are the cost band schedule risks. Although analysis can easily is done regarding the schedule risk involved. Risk management is the area that tries to ensure that the impact of risk on cost quality and schedule.
Like in booking system cost and quality is major risk prone area. it minimizes the impact of risk. Project management generally does it, risk assessment is and activity that must be undertaken during project planning, and this involves identifying the risk occurs in system, analyzing them and prioritizing them on the analysis due to the nature of the software uncertainties are most near the beginning of the project and remain throughout the project so risk assessment should be done throughout the project.
IMPLEMENTATION
After the user has certified the system, it comes to the stage of implementation. it involves many issues like preparation for the changeover to the new system and then the actual change over. Preparation of site and installation and facilities, training of staff, preparation of data file etc. are the various steps involved which might require the involvement of the system analyst, the user as well as operational staff.