LOAD TEST ON A SINGLE PHASE TRANSFORMER
LOAD TEST ON A SINGLE PHASE TRANSFORMER.docx (Size: 54.52 KB / Downloads: 24)
PRECAUTIONS:
1. Auto Transformer should be in minimum position.
2. The AC supply is given and removed from the transformer under no load condition.
PROCEDURE:
1. Connections are made as per the circuit diagram.
2. After checking the no load condition, minimum position of auto transformer and DPST switch is closed.
3. Ammeter, Voltmeter and Wattmeter readings on both primary side and secondary side are noted.
4. The load is increased and for each load, Voltmeter, Ammeter and Wattmeter readings on both primary and secondary sides are noted.
5. Again no load condition is obtained and DPST switch is opened.