29-08-2014, 03:39 PM
Today, we are passing through the era of the technology. The technology field is growing at a treatment rate. Technical education has been playing an important role in the economic development of our country. We are proud having highest number of skilled technically manpower in the world. But, now we are going to face with the new challenges put up by the process of the globalization, liberalization and hi-fi technological developments, which have affected each and every sphere of human activity. It has become imperative to rise the occasion. With the technical education one can setup one’s industry and if knew the facts he can made his industry, the number one industry in the world. To make seek the technical knowledge GOVT. has setup the institutes where each student studying is provide the technical knowledge to stand up in the market and work with their own hands. We are very thankful to all our lecturers of Mech. Engg. who encourage us for Writing this report.
The main idea behind the project is to reduce the material cluster present at various places in the workshop and to reduce the transport time and setup time of the raw material.
We have gone through different workshop in order to examine the problems with the material handling. The result we got is the repeated transfer of material one section to other No. of times. Which result in increasing of production time, lead time, thus increasing the cost of the product.