INTRODUCTION OF NFL
National Fertilizer Limited was established in 23th August 1974, to set up two fuel oil based plants at Bhatinda(Punjab) and Panipat (Haryana). Both of them were commissioned in 1979. The Nangal fertilizer plant of fertilizer corpoartion of India (FCI) has been merged with NFL in 1978 on the recoganition of FCI and NFL group of companies. Later NFL executed its gas based plant at Vijaipur(MP) on HBJ gaspipe line.Vijaipur plant had gone in commercial production in july,1988.
NFL is now operating three fuel oil based plants located at Panipat, Bhatinda, Nangal and gas based plant at Vijaipur.
FERTILIZER, INDUSTRIAL PRODUCTS AND SERVICES
Kisan Urea and Kisan Khad :- NFL’s popular brands are sold over a large marketing territory spanning the length and breadth of the company. The company also manufactures and markets Biofertilizers and a wide range of industrial products like Methanol, Nitric Acid, Sulphur, Liquid Oxygen etc.
Kisan Urea
Kisan Urea is a highly concentrated solid nitrogenuous fertilizer, containing 46.0%. It is completely soluble in water hence nitrogen is easily available to crops. It contains Nitrogen in amide form which changes to ammonical forms and is retrieved by soil collides for longer duration. Urea is avilable in Granular form and can be applied by drill and broadcasting.
Kisan Urea is ideally suited for all types of crops and for foliar spray, which instantly removes nitrogen deficiency. Kisan Urea also has a strong and long lasting effect on crop resulting in bumper crops. Carbonic acid present in Kisan Urea helps in absorption of other nutri.
NATIONAL FERTILIZER LIMITED
INTRODUCTION OF PANIPAT UNIT
The panipat unit if NFL is situated on National Highway no 1 and Delhi-Amritsar railway trunk route. Panipat city is about 90 Km from Delhi and is covered in National Capital Region. Panipat is a hiatorical city , which was the scene of historical battles.
Government of India passed a project on 10/2/1975 and contruction was started from 30/4/75. The project was completed on 2/9/78 i.e in 40 months.
TOYO Engineering Corporation, Japan and Engineers India Limited was the main contractors.