23-08-2012, 11:45 AM
ONLINE BUS RESERVATION SYSTEM
DATA STRUCTURES PROJECT.pptx (Size: 2.05 MB / Downloads: 42)
PROJECT PLAN:
1)Gathering the required information.
2) considering the rules which had given by faculty
3)Source – Net : Red bus.in/APS-RTC
4)Review-1
5)Project Submission
REVIEW 1:
INTRODUCTION
Our project is to computerize traveling company to manage data, so that all the transactions become fast and there should not be any error in transaction like calculation mistake, bill generation and other things. It replaces all the paper work. It keeps records of all bills also, giving to ensure 100% successful implementation of the computerized Bus reservation system.
Abstract:
The objective was two-fold - to ensure that the Customers don’t have to leave the confines of their comfort to book a ticket, and to help them get a ticket when they need it the most.
The internet was being voted as a medium people couldn’t do without. PC and net penetration was increasing not only in urban areas, but also in rural India. Also, people were getting used to booking tickets for travel using IRCTC and private airline websites. So, why not buses?
Online system provides real time quotations, real time bus booking services for round trips, multiple payment channels, cost comparison,last minute booking, an in-house call center and even home delivery of tickets.
Online system provides real time quotations, real time bus booking services for round trips, multiple payment channels, cost comparison,last minute booking, an in-house call center and even home delivery of tickets.
Back-end database:
A back-end database is a database that is accessed by users indirectly through an external application .
This is rather than by application programming stored within the database itself or by low level manipulation of the data
A back-end database stores data but does not include end-user application elements such as stored queries, forms, macros or reports.
Front end database:
1) Booking
2) Cancelling
3) From: To:
Date of journey:
Mode of payments
Hardware Requirements:
PC with core 2 duo or more proccessor
512 MB RAM or above.
180 GB Hard Disk or above.
Software Requirements:
Operating system : Windows XP (or) 7.
Dev c++ & Code blocks compilers.
Microsoft word and powerpoint
ALGORITHM:
1) Taking a class named as a.
2) Declaring the variables and arrays as busn[5], driver[10], arrival[5], depart[5], from[10], to[10], seat[8][4][10].
3) And in public of the class we are giving member functions as
void install();
void allotment();
void empty();
void show();
void avail();
void position(int i);
4) And giving that maximum buses available are 10.
5) And now with respect to installing function we gave few options to enter in the run time which will gives to enter the bus details from back end of the system like bus no, Driver's name, Arrival time, Departure time, from and to .
6) And now with respect to allotment function we can allot seats for customer according to their preferable seat numbers.
7)And the empty function shows that the seats are empty in the bus.
8) And the show function shows that the how many seats available in the given bus.And which seats are all ready reserved in the bus.
Step 2:
Second step is that we have to install the number of busses that we have to provide for customers and this is done by the back end system and in this function we have to give details of the bus like bus num,Drivers name,Arrival time ,departure time,From and To.