04-07-2012, 03:20 PM
ONLINE TEST
ONLINE TEST.doc (Size: 1.08 MB / Downloads: 49)
INTRODUCTION
ABSTRACT
ONLINE TEST is a software in which we have specified some questions, a timer runs for given time and within that period one has to answer for all those questions, some buttons are presented at the bottom of the window like start button, previous , next , finish.
When we click the start button the online test get started, you will have to answer 25 questions with in 10 minutes, the timer runs.
If you do not wish to answer a particular question you can move on to next question by pressing next button or if you wish to move to the previous question that you had skipped you can make this move by previous button.
The environment used for this project is JAVA. This project is based on core JAVA. The software used for this java SDK1.5, Window XP operating system.
OBJECTIVES
This concept of online test fulfils the following requirements:
It provides a less expensive as well as an effective method of performing examinations.
It provides best facilities for the students to answer the question only with a single click.
It saves time as well as money.
It lessens the student’s and teacher’s frustration.
AREAS OF APPLICATION
Across the globe: This project finds it application in conducting examination over the globe.
Student’s needs: It saves time as well as money. It lessens student’s frustration.
SYSTEM ANALYSIS
FEASIBILITY STUDY
Feasibility study defines all the requirements to performance characteristics of system.
For system to be feasible, the design needs to undertake various factors or performance requirements by which the system will be operated.
A feasibility study is short, focused study which aims at selecting the best system that meets performance requirements. Information is gathered regarding the general requirements of the proposed system.
If feasibility study is to serve as the decision document, it answers a number of questions.
Like
Is it beneficial?
Does it save time and money?
Can it be integrated with other systems already in place?
Planning resources is a very vast concept and we are beginners, thus including each and every aspects of web, Integrate and automate them in every respect was not feasible for us.Hence we perform feasibility study to make our project compatible for present environment. The concept of Online Testis newer. The project is built with the help of JAVA technology which is reliable and efficient platform to work upon. This concept saves time and lessens the teacher’s and student’s frustration.
Technical feasibility
Technical feasibility takes of the all the issues concerned with the design and the development part of the project. It concerns itself with the software, hardware and the platform related issues. The following are the technical specifications for our project.
The project would require a lot of space for storage of static as well as dynamic content.
As the number of project available increases the space required for storing them increases.
Economic feasibility
It provides an efficient and reliable platform to work upon.
It saves time and is thus a faster means of examination.
It is less costly than the other means of examination.
HARDWARE AND SOFTWARE REQUIREMENT
Software Requirements
Operating System : Window 2000/XP
Front End : JAVA sdk1.5
Hardware Requirements
Machine : Pentium 4
Speed : 233 MHz and above
Hard Disk : 10GB
RAM : 256MB
SYSTEM DESIGN
MODULES AND THEIR DESCRIPTOIN
Administrator module
The administration process can be complex and must be properly planned and managed to ensure a successful project. Administrators are a professional team trained to follow a project plan that has been designed specifically for you. Administrator develops software and enhances it process.