1.3.2 Objective
As this project is a huge one to maintain. The actual goal is to provide the facilities of complete management and to improve the capability and working progress of user and take out them from hectic paper work. This project not only manages the records and keep details but also generate the reports too.
Feasibility Study
Three key consideration are involve in the feasibilty analysis:
• Economic
• Technical
• Behavior
Analysis
Analysis is the process of that gives the system analyst a complete and through understanding of a system that is necessary prerequisite before proceeding.
The first step in analysis is the process of the data gathering. Following source may be used for the collection.
• Observation Existing Procedure
• Questionnaires
• Interviews
• Data Collection
System Analysis And Design:
System analysis and design are the application of the system approach to problem solving,generally using computer.To reconstruct a system the analyst must consider its elements,outputs and inputs,processors,controls,feedback and environment.
After identification of the problem and testing its feasibility,we have analyzed the projet closely and gathered the related data from concerned people. We contacted authorized people to collect the student data,subject details of course
and teachers assigned.
3.1 Introduction
The software, Site Explorer is designed for management of web sites from a remote location.
Purpose: The main purpose for preparing this document is to give a general insight into the analysis and requirements of the existing system or situation and for determining the operating characteristics of the system.
Scope: This Document plays a vital role in the development life cycle (SDLC) and it describes the complete requirement of the system. It is meant for use by the developers and will be the basic during testing phase. Any changes made to the requirements in the future will have to go through formal change approval process.
DEVELOPERS RESPONSIBILITIES OVERVIEW:
The developer is responsible for:
• Developing the system, which meets the SRS and solving all the requirements of the system?
• Demonstrating the system and installing the system at client's location after the acceptance testing is successful.
• Submitting the required user manual describing the system interfaces to work on it and also the documents of the system.
Limitations
1. High security.
2. Ticket generation.
3. Graphical view of booking of seats.
4. Report generation.
Conclusion
As this project is a huge one to maintain. The actual goal is to provide the facilities of complete management and to improve the capability and working progress of user and take out them from hectic paper work. These projects not only manage the records and keep details.