PROJECT MANAGEMENT
PROJECT MANAGEMENT[.docx (Size: 71.23 KB / Downloads: 17)
Project Management is an important part of project development. It deals with all the main areas for project development like Feasibility, Requirement analysis, Project Schedule, Project Plan etc. We have used the Project management approach to deal with all these areas. It is achieved by proper selection of Software Life Cycle Model.
PROJECT PLANNING
Project planning is perhaps one of the most important works in developing any project. Before the project can begin, estimate regarding work to be done, what resources will be required and how much time will elapse from start to the finish of a project. Planning helped us to prepare a framework that enabled to make us a reasonable estimate of all such things.
Project Development Approach and Justification
Our project is developed using specific software development lifecycle. Software development approach is best suited for the project depends on the requirement and other factors. A process model is a development strategy that is used to achieve a goal that satisfies the requirements abiding by the constraints.
There are many types of Software Process Model like:
1. Spiral Model
2. Linear Sequential Model (Waterfall Model)
3. RAD(Rapid Application Development) Model
4. Incremental Model
We have implemented our project using the Incremental Model.
The incremental model is a method of software development where the model is designed, implemented and tested incrementally (a little more is added each time) until the product is finished. It involves both development and maintenance. The product is defined as finished when it satisfies all of its requirements. This model combines the elements of the waterfall model with the iterative philosophy of prototyping.
Risk Planning
For scheduling risk we had decided the strategy that as everything is not properly defined, any requirement which comes to us will be kept by us and we will check its feasibility.
There is no alternative of the process risk; we need to study current structure and standard of the current system deeply.
Changing requirement risk, strategy has been decided that traceability information should be maintained every time the requirement added.