Prefabrication
Prefabrication.docx (Size: 56.72 KB / Downloads: 50)
INTRODUCTION
Prefabrication is the practice of assembling components of a structure in a factory or othermanufacturing site, and transporting complete assemblies or sub-assemblies to the construction site where the structure is to be located. The term is used to distinguish this process from the more conventional construction practice of transporting the basic materials to the construction site where all assembly is carried out.
The term prefabrication also applies to the manufacturing of things other than structures at a fixed site. It is frequently used when fabrication of a section of a machine or any movable structure is shifted from the main manufacturing site to another location, and the section is supplied assembled and ready to fit. It is not generally used to refer to electrical or electronic components of a machine, or mechanical parts such as pumps, gearboxes and compressors which are usually supplied as separate items, but to sections of the body of the machine which in the past were fabricated with the whole machine. Prefabricated parts of the body of the machine may be called 'sub-assemblies' to distinguish them from the other components.
The process and theory of prefabrication
An example from house-building illustrates the process of prefabrication. The conventional method of building a house is to transport bricks, timber, cement, sand, steel and construction aggregate, etc. to the site, and to construct the house on site from these materials. In prefabricated construction, only the foundations are constructed in this way, while sections of walls, floors and roof are prefabricated (assembled) in a factory (possibly with window and door frames included), transported to the site, lifted into place by a crane and bolted together.
Prefabrication is used in the manufacture of ships, aircraft and all kinds of vehicles and machineswhere sections previously assembled at the final point of manufacture are assembled elsewhere instead, before being delivered for final assembly.
The theory behind the method is that time and cost is saved if similar construction tasks can be grouped, and assembly line techniques can be employed in prefabrication at a location where skilled labour is available, while congestion at the assembly site, which wastes time, can be reduced. The method finds application particularly where the structure is composed of repeating units or forms, or where multiple copies of the same basic structure are being constructed. Prefabrication avoids the need to transport so many skilled workers to the construction site, and other restricting conditions such as a lack of power, lack of water, exposure to harsh weather or a hazardous environment are avoided. Against these advantages must be weighed the cost of transporting prefabricated sections and lifting them into position as they will usually be larger, more fragile and more difficult to handle than the materials and components of which they are made.
Advantages of prefabrication
1. Self-supporting ready-made components are used, so the need for formwork, shuttering and scaffolding is greatly reduced.
2. Construction time is reduced and buildings are completed sooner, allowing an earlier return of the capital invested.
3. On-site construction and congestion is minimized.
4. Quality control can be easier in a factory assembly line setting than a construction site setting.
5. Prefabrication can be located where skilled labour is more readily available and costs of labour, power, materials, space and overheads are lower.
6. Time spent in bad weather or hazardous environments at the construction site is minimized.
7. Less waste may occur
8. Advanced materials such as sandwich-structured composite can be easily used, improving thermal and sound insulation and airtightness
Disadvantages
1. Careful handling of prefabricated components such as concrete panels or steel and glass panels is required.
2. Attention has to be paid to the strength and corrosion-resistance of the joining of prefabricated sections to avoid failure of the joint.
3. Similarly, leaks can form at joints in prefabricated components.
4. Transportation costs may be higher for voluminous prefabricated sections than for the materials of which they are made, which can often be packed more efficiently.
5. Large prefabricated sections require heavy-duty cranes and precision measurement and handling to place in position.
6. Larger groups of buildings from the same type of prefabricated elements tend to look drab and monotonous.
7. Local jobs may be lost, if the work done to fabricate the components being located in a place far away from the place of construction. This means that there are less locals working on any construction project at any time, because fabrication is outsourced.