01-08-2012, 11:08 AM
Project Solid waste Management at Panga Dumping Ground
Solid waste.pptx (Size: 4.53 MB / Downloads: 90)
First Step
Separating of Plastics and garbages
Introducing Kuranis at first for collecting at their cost
Program of separating & collecting by our men at later stage for Recycling of Plastics
Second Step
Constructing of temporary sheds by bamboos and cement bags/ Jute bags
Making 3 – 4 Nos. Compartments initially of around 1.5 ft height by brick walling
Third Step
Arrangement of water spraying
By installing a diesel pump set and taking water from Panga river
Alternatively drawing a pipe line from the nearby Deep tube well
source
Resources
Cement bags from JPI
Cement, Bricks, Stone chips from Jalpaiguri Municipality
Pump set from Jalpaiguri Polytechnic Institute
Manpower Requirement
Guarding of equipments by Jalpaiguri Municipality
Scavenger 1 No. daily by Jalpaiguri Municipality