20-05-2014, 04:51 PM
RAW MATERIAL HANDLING PLANT--BOKARO STEEL PLANT
1370336259-RMHPATAGLANCEYR2011.ppt (Size: 221.5 KB / Downloads: 24)
OBJECTIVE
1. Releasing of raw material wagons within
stipulated time to avoid demurrage and the rake clearance time is 14.00 hrs.
2. Making of blended stock pile as buffer stock.
3. Uninterrupted supply of raw material to Blast
Furnace, Sinter Plant and Refractory Material
Plant.
4. Consistency in quality.
Vision
To be a respected World-class corporation and the leader in Indian steel business in quality, productivity profitability and customer satisfaction
Credo
We build lasting relationships with customers based on trust and mutual benefit.
We uphold highest ethical standards in conduct of our business.
We create and nurture a culture that supports flexibility, learning and is proactive to change.
We chart a challenging career for employees with opportunities for advancement and rewards.
We value the opportunity and responsibility to make a meaningful difference in people’s lives.
Core Values
Customer Satisfaction
Concern for people
Consistent profitability
Commitment for excellence
Mission Statement
Retain Leadership in Flat Products business.
Build a strong team to Excel.
Take on tomorrow’s Challenges.
Sharing Prosperity with the Society.
Our Values
We are committed to :
All-round Improvement in Performance.
Cost Reduction and Waste Minimisation.
Safe and Eco-friendly Operations.
Timely Project Implementation.
Fulfilling Corporate Social Responsibility.
Electricity Cost – 1 KWH/T (Material Handling)
Water Consumption – Rs.0.23/T Crude Steel
Repair & Maintenance Cost – Rs. 20.62/T Material
Handling
4. Conveyor Belt Cost – Rs. 2.03/T of Mat. Handling
5. Spares Cost & Consumables – Rs. 3.72/T Material
Handling