13-11-2014, 02:11 PM
Abstracts: There is a major problem of traffic at Mehsana on SH-41, So to overcome this problem Mehsana-By Pass is strongly needed which will help to resolve several traffic issues that currently cause problems for residents, business people and also for mass transportation. It will divert the high volume of traffic, with its large number of heavy commercial trucks, away from the town. So in this project we have considered topics about construction work of By-Pass Highway like various Soil test, Earthwork, cross section of Pavement, Factors affecting pavement etc. As the existing highway is belonging to State Highway category (SH41) crosses the Mehsana city traffic, this by-pass highway project will resolve the congestion problems occurred in peak time and also this will reduce the travel time of heavy vehicles by diverting their routes which also induces the economy in fuel consumption. Moreover, it will reduce the chances of accidents on the existing highway. It also imparts the infrastructural development on the surrounding areas of Mehsana District. By all these various aspects of the project, this will be very much essential and fruitful project.