Targets for 2012-13
To reduce the Aux Consumption to 7%.
Improvement of Lighting system for better illumination and energy management.
HT VFD Training for better fault finding and operation reliability.
Implementation of Centralized Energy Management System .
Further Reliability of Emergency Power by Change over between existing DG sets.
Availability of Power for FGD Project.
All drives efficiency Analysis.
Control of Consumables for plant .
Compulsory Internal Training for all staff and planning for the External Training for every TNI.
Infrastructure for in house testing facility for electrical equipments
Best Practice of Department
Operation of ACC fan for 5% overload for better Vacuum maintaining .
Support to ABB by Material and Manpower for Project completion on time.
Reactive Power Control to prevent over voltage of grid.
Prevent Ideal running of Equipments during shutdown for energy saving.
Proactive Maintenance for plant
Learning form Failures
Learning from AVR Tripping ,Power angle is improved for leading pf.
Differential Tripping of reactor is rectified and sequence of breaker operation is changed
400 KV CT Failure (Release of pressure manually).
Over Voltage setting revised for Grid reliability.
IPBD Support Structure heating rectified by Support earthing by shorting all ducts.
Creative & Innovative work
Automation of LHP (Running hour improved).
Change Relay setting of 400 KV Grid for better Grid availability.
APC scheme for Shree Power plant availability.
Auxiliary Power from SPP for Plant testing before availability of 400 KV Grid to reduce .
Analysis of plant operation by Thermo graphy and harmonics analysis.
Optimization of Transformer Tap for all equipments for energy saving.
Next Month Target
GCB monitoring in DCS.
100% Indentation all plant spares critical for plant operational reliability.
Service power supply availability for all areas decrease shutdown time.
Thermo graphy of whole plant.
HVAC Optimization for temperature control.
Installation of Energy Saving Lighting Transformer .
Rainy Season pre cautionatory steps.
Shifting of TIE-1 Power Cable
Support Needed from Management
Trainings/Workshops for new technology and seminars to arranged.
Infrastructure for Lab .
Centralized Workshop.
Portable Drinking water.
IT and Infrastructure Improvement.
FORMEN requirement for Plant Maintenance.