27-02-2016, 04:56 PM
Testing is performed at an internationally recognized, independent research, engineering and evaluation laboratory who by contractual agreement with their clients does not allow the use of their name or logo because doing so may imply an endorsement of products or services. For this reason, all references to said independent third party lab have been removed. Should you require the full unedited version, please contact the company identified below.
SUMMARY OF TESTS PERFORMED
Project Number:
Company:
Equipment Tested:
Test Dates:
Notes:
18.04481.28
Panasonic System Communications Company
Two Riverfront Plaza
Newark, NJ 07102
Attn: Pala Vachirabanjong
Panasonic CF-54 Computer
January 2015 - March 2015
Each test item was able to boot into the Microsoft® Windows® 7 Professional operating
system following each of the tests described within this summary report. For those tests requiring operation during the test parameter application, it was confirmed that the test item was able to play an audio/visual file. A listing of summarized tests and results appear in the accompanying table. Full details will be provided in Report Number 18.04481.28.100.FR1.
Report Written By:
Eric Dornes
Principal Engineer
Structural Dynamics and Product Assurance Section