Varieties of Hydro Resources Available in Nature
Each Resource is naturally fit in the classification?
Any modification of the resource is required for better harvesting of resource?
Methodology of HEPP Development
Site Survey: Hydrological & geological Survey.
Estimation of Potential
Regulations & Environmental Concerns
Feasible Supply
Turbine Selection
Costing and Payback.
Hydrological Survey: Flow Duration Curve
To measure the flow-rate vs time at a given site.
Direct Measurement of the flow rate.
The more robust option is to find out the flow-rate by working out the volume of water that was entering the river.