The project is based on vehicular under pass (vup) construction of four lanes roads and bridges our project is held at verka byepass(Amristar). our project provided bridges,kerb laying,roads,toll plaza,structures,electric pole, toll plaza etc.
The project work is a major part of our curriculum. the primary objective of the projectwork is to raise the level of performance and this may be exercised by improvising new techniques .
the project entitled construction of bridge on Amritsar -Pathankot Section(NH-15) that is Amritsar-Jammu National Highway is a Bridge Making project On amritsar pathankot section . our site is at Verka bye pass(Amritsar). the chainage location is at 80-135 is taking from the pathankot bridge and is still in progress
At our first we do excavation with the help of JCB that is Earth moving machine and the after filling of grade sub base that is GSB is mixture of aggregates and cement which is used to spread the load of paving . after rolling we pcc and the raft footing is to be done and finally slab is making horizontally . this bridge is called as VUP .