09-10-2014, 03:54 PM
Abstracts: To measures the time of pump assembly per shift there by using of work measurement and material and finding the production rate of the firm. The problem is to justifies the west of time during assembly using work measurement technique along with material handling finding the reason of low production, to desire solution. Two important function of production management are installation of the most effective method of performing the operation and the control of resources mainly plant and labor required in carrying out the operation. The work study mainly deals with the time and motion study and work measurement determine the time required by the operator to complete specific task hence by using work measurement and method study one can analyze the 4m (man, machine, material, money ) concept there by fulfilling the objective of problem status. The major emphasis of method study given to charts such as, Flow chart, p-chart, c-chart, string diagram, travel chart