20-10-2014, 03:22 PM
a)Doing space, consumption, process analysis I analytically calculated how many Silos (tobacco storing machines) must be installed, for which types of tobacco they must be installed, and to which cigarette maker machines they must be connected. And correspondingly what will be the changes in the layout. b) Study of the working and the construction of the installed boilers and thus finding out the possibilities where efficiency of the boilers can be increased .I gave some valuable suggestions and proposed to install Turbulators inside boilers.