05-09-2016, 05:56 PM
1451845779-Elcentroregionaldecontroldeenerga1 (1).docx (Size: 1.57 MB / Downloads: 7)
General objective
A presentation of the technical visit to Loreto substations and cattails through information obtained through the engineer in charge of the EEASA to defend him in class and clarify some dudad that may come to have peers.
Specific objectives
• Make a report with the information obtained.
• Clarify dudad that may have been in this technical visit by this work.
• Conduct a technical view video.
The regional energy control center.
Ambato is being implemented in the regional energy control center with a modern infrastructure which will contribute to improving the quality of regional electric service. This control center is designed to monitor and control the operation of all primary feeders and substations in the provinces of Tungurahua, Cotopaxi, Chimborazo, Bolívar, Napo, Pastaza and Morona Santiago.
The information obtained in this center will serve to take action to improve and ensure the quality of electricity service.