20-10-2014, 03:12 PM
The project deals with time and motion study of the assembly line for Alfa Passenger carrier model using Maynard Operation Sequence Technique. Different operations, studied at the micromotion level, were distributed among minimum possible workmen aimed at reduction of idle time which resulted in increased productivity.