20-10-2014, 04:08 PM
This project dealt with finding out various causes of leakage from bleeder valves and suggesting remedial actions so as to let blast furnace operate at desired pressure and eliminating the possibility of inturrptions in production which happen during the repairing or replacement of failed part of bleeder valve.