21-03-2012, 06:58 PM
im shareef.
i need the module diagram...
names of the modules are
1.client server module
2.managed delay network module
3.transmitter module
4.queuing analysis module
5.scheduling policies module...
i need this for urgent...help me to know this..
my abstract:
ABSTRACT
We analyze the delay performance of a multi-hop wireless network in which the routes between source-destination pairs are fixed. We develop a new queue grouping technique to handle the complex correlations of the service process resulting from the multi-hop nature of the flows and their mutual sharing of the wireless medium. A general set based interference model is assumed that imposes constraints on links that can be served simultaneously at any given time. These interference constraints are used to obtain a fundamental lower bound on the delay performance of any scheduling policy for the system