Seminar Topics & Project Ideas On Computer Science Electronics Electrical Mechanical Engineering Civil MBA Medicine Nursing Science Physics Mathematics Chemistry ppt pdf doc presentation downloads and Abstract

Full Version: ABOUT THE PROJECT
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
ABOUT THE PROJECT


[attachment=65130]

"U Auction" is an online auction web site aimed at taking the auction to the finger tips of aspiring bidders there by opening up the doors of the "OPEN Auction House' to a wider cross section of Art Lovers and Antique Collectors. This site also acts as an open forum where buyers and sellers can come together and exchange their products. The site makes sure that the sellers get a fair deal and buyers get a genuine product.
Home Page - The site opens up door to aspiring web users through the Home page. The Home page is designed in such way that the layout is as user friendly as possible. There is a navigational menu at the top of the page which links to various inner pages. There is a category drop down on the left side for easy manipulation. The center area is for displaying latest products in the chorological order.
Login/User Registration - Those who wish to take part in bidding or sell products at the site have to register at the site as seller or buyer. Only authenticated users can take part in selling or in bidding. The system automatically rejects un-authenticated users who try to bid or sell at the site.
Register Products - This module is for presenting items for bidding. Only those who have registered and authenticated as sellers can place their articles for bidding. The Module collects information like Product Name, Product Details, Starting Bid amount, Incremental value etc. The system automatically inputs the closing date.
Bidding Module - The module is for bidding on any selected item. The bidder has to authenticate before participating in bidding. The system checks whether the incremental amount entered by the bidder is equal or more than the incremental minimum set during the product registration time. The system places the record in the bid history against the bidder account.
My Auction - This page is an interface for both buyer and seller. Buyer can see the profile of the bidding history of items which are still open on which he/she has already bided. Similarly the seller can see the progress of bidding on articles he/she has placed for bidding.
Feedback - The purpose of the page is to send messages/comments to the web administrator.
FAQ - This page is meant for first time users of the site. The page provided answers to questions which are common and frequently asked.
WebAdmin - This link opens to the administration module which is open to web administrator only. Here site administrator can add product categories and can edit product information like closing date. Also there is an option for administering the closed bids. This module is for contacting the bidder and seller by email instructing them to settle the transaction within a time frame.

PROBLEM DEFINITION

The problem with public auction is that the participation of the general public is very limited. The aim of the project is to socialize the auction so that people from far & wide and even across the continent can participate in it. The "U Auction" site is developed with a vision to wipe out the inherent problems of "Conventional Auction House". The salient features of the site are as follows:
1. Paperless Auction System
2. It's accessible to everyone, at any time no matter where they are
3. Reliable user validation & checking.
4. Easy online settlement.
"U Auction" is designed in such a way that it is as user friendly as possible. So any aspiring bidder or seller can visit the site and engage in bidding with least effort.

2.1 EXISTING SYSTEM

The existing "OPEN Auction House" is managed manually. Prior to each auction, the day of auction, the venue and the items on auction are announced through news media. Those who wish to take part in the auction have to arrive at the venue on that day on time. This conventional method most of the times prevent aspiring bidders from participating in the bidding process. Another headache of the old system is to track each bidding process and to make it culminate in financial settlement. So the system has to keep records of both buyers and sellers until the end of settlement. The process is very cumbersome and time consuming.

2.2 PROPOSED SYSTEM

The slogan of the new site is AAA, 'Anyone, Anytime, Anywhere'. That what it really is The "U Auction" is online auction house so the seller or bidder doesn't need to go anywhere, instead they can take part in the auction just sitting in the comfort of their living room, be it during the day or night.
The proposed computerized "U Auction" site has made auction process simple. The only
5 pre-condition is that the user must register and authenticate before he/she can take part in the bidding process. The system uses HTTP forms authentication which creates a session cookie for any signed in user. Through out the span of the session the cookie remains valid until the user logs out.
An auction house needs to have products to auction, so in the proposed system this is done using product registration module. The module is open to user who is registered sellers and they need to authenticate before they register any product. The system controls the closing date by adding 14 days to the submitting date there by restricting the bidding process to go on indefinitely.
Another important module in the proposed project is the "Bidding module ". Here one can see the details of any particular product and also the bidding history. The user can bid on that item by entering any amount greater than or equal to the incremental bid amount. Here also system checks to see whether the user has his credential verified otherwise he/she will be directed to the login/registration page.
The last but the least module is the "Web Administration" module. The module is only open to the web administrator due to security reasons. In this module the administrator can add product categories; this is to avoid rampant creation of categories. The 2nd thing is the option to edit any given product. This will be necessary when some of the details of the product need to be edited for one reason or other. The 3rd and last the closed bid manager where the administrator notifies both the seller and buyer the need to complete the transaction.
There is another module which runs more or less like background process. The function of the module is to close bid of those products whose closing date is less than the current date. The process is automatic and hidden from the web users.


PRELIMINARY INVESTIGATION

A request to receive assistance from information system can be made for many reasons, but in case a manager, employee or system specialist initiates the request. When that request is made, the first system activity preliminary investigation begins. The activity has three parts
> Request clarification: the request from employee may not be well stated. Sometimes the request may not be well defined. Therefore before any system investigation can be considered, the project request must be examined to determine precisely the actual requirements of the organization.
> Feasibility study: the basic idea behind feasibility study is to determine whether the project is feasible or not.
> Request approval: all projects that are requested are not desirable or feasible .some organization receive so many projects requests from employee that only a few of them can be pursued. However those projects that are feasible and desirable should put into a schedule. The management decides request that are most important. After a project request is approved the cost priority, the completion time and the personal required are estimated. Once the request is approved, the collection of data and determination of requirements can be started.

CHAPTER 5 REQUIREMENT SPECIFICATION

The primary goal of the system analyst is to understand the requirements of the new system that is to be developed. For that the study of specification of the requirements is very essential. For the development of the new system, a preliminary survey of the existing system will be conducted. Investigation is done whether the upgradation of the system into an application program could solve the problems and eradicate the inefficiency of the existing system.

5.1 FEASIBILITY STUDY

The basic idea behind feasibility study is to determine whether the project is feasible or not. A feasibility is conducted to identify a best system that meets all the requirements. This includes an identification ,description, an evaluation of the proposed systems and selection of the best system for the job .
The requirements of the system are specified with a set of constraints such as system objectives and the description of the out puts. It is then duty of the analyst to evaluate the feasibility of the proposed system to generate the above results. Three key factors are to be considered during the feasibility study.

5.1.1 Operation Feasibility

An estimate should be made to determine how much effort and care will go into the developing of the system including the training to be given to the user. Usually, people are reluctant to changes that come in their progression. The computer initialization will certainly affected the turn over, transfer and employee job status. Hence an additional effort is to be made to train and educate the users on the new way of the system.

5.1.2 Technical Feasibility

The main consideration is to be given to the study of available resources of the organization where the software is to be implemented. Here the system analyst evaluates the technical merits of the system giving emphasis on the performance, reliability, maintainability and productivity.
By taking the consideration before developing the proposed system, the resources availability of the organization was studied. The organization was immense computer facilities equipped with sophisticated machines and the software hence this technically feasible.

5.1.3 Economic Feasibility

Economic feasibility is the most important and frequently used method for evaluating the effectiveness of the proposed system. It is very essential because the main goal of the proposed system is to have economically better result along with increased efficiency. Cost benefit analysis is usually performed for this purpose. It is the comparative study of the cost verses the benefit and savings that are expected from the proposed system. Since the organization is well equipped with the required hard ware, the project was found to be economically.

6.1 LOGICAL DESIGN

Logical design of an information system shows the major features and also how they are related to one another. The first step of the system design is to design logical design elements. This is the most creative and challenging phase and important too. Design of proposed system produces the details of the state how the system will meet the requirements identified during the system analysis that is, in the design phase we have to find how to solve the difficulties faced by the existing system. The logical design of the proposed system should include the details that contain how the solutions can be implemented. It also specifies how the database is to be built for storing and retrieving data, what kind of reports are to be created and what are the inputs to be given to the system. The logical design includes input design, output design, and database design and physical design

6.2 INPUT DESIGN

The input design is the link between the information system and the user. It comprises the developing specification and procedures for data preparation and those steps are necessary to put transaction data into a usable form for processing data entry. The activity of putting data into the computer for processing can be achieved by inspecting the computer to read data from a written or printed document or it can occur by having people keying the data directly into the system. The design of input focuses on controlling the amount of input required, controlling errors, avoiding delay, avoiding extra steps and keeping the process simple.
The system needs the data regarding the asset items, depreciation rates, asset transfer, physical verification for various validation, checking, calculation and report generation.. The error raising method is also included in the software, which helps to raise error message while wrong entry of input is done. So in input design the following things are considered.
What data should be given as input
¢ How the data should be arranged or coded
¢ The dialogue to guide the operating personnel in providing input.
¢ Methods for preparing input validations and steps to follow when error occur
¢ The samples of screen layout are given in the appendix.

6.3 OUTPUT DESIGN

Computer output is the most important and direct information source to the user. Output design is a process that involves designing necessary outputs in the form of reports that should be given to the users according to the requirements. Efficient, intelligible output design should improve the system's relationship with the user and help in decision making. Since the reports are directing referred by the management for taking decisions and to draw conclusions they must be designed with almost care and the details in the reports must be simple, descriptive and clear to the user. So while designing output the following things are to be considered.
¢ Determine what information to present
¢ Arrange the presentation of information in an acceptable format
¢ Decide how to distribute the output to intended receipts
Depending on the nature and future use of output required, they can be displayed on the monitor for immediate need and for obtaining the hardcopy. The options for the output reports are given in the appendix.