01-09-2014, 11:25 AM
faliure of damper Propproper torque to be ensured. Use proper corrosion resistant chemicals on threads left open after assembly Plastic cap provided on primary dampers are found missing during inspection. An additional nut can be provided to cover the bare threaded portion. Cleaning/washing of bogie at regular intervals Details of Dampers should be recorded by railways upon receipt of new coaches & during replacement as these details are not readable afterwards. This will help during warranty replacementer fitment of end fittings with.