Seminar Topics & Project Ideas On Computer Science Electronics Electrical Mechanical Engineering Civil MBA Medicine Nursing Science Physics Mathematics Chemistry ppt pdf doc presentation downloads and Abstract

Full Version: SHASHIKANT RESUME
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
SHASHIKANT



[attachment=68302]


CAREER OBJECTIVE

To work in organization which gives me ample scope for both professional and personal growth and development, where in my skills and potential for career advancement will contribute to the efficiency and profitability of the organization.


CLIENTS LIKES

1)- Working in 210*4mw Sanjay Gandhi Thermal Power Plant, Birsinghpur, Madhya Pradesh(Since 11 march to till date)

2)-2*300Mw DhariwalThermal Power Plant Tadali Midc Chandrapur
Maharashtra.(Since 9 march 16 april 2014 )
3)- 1*67.5mw Power Plant & Blower House at Visakhapatnam Steel Plant, Visakhapatnam(A.P.)( 14 january to 6 march 2014 )
4)-Working in 2*250MW (M/S Uttar Pradesh Rajya Vidut Utpadan Nigam Ltd. Kashimpur, Aligarh (U.P.) Client Ultra Tech Cement Ltd. & J.P. Cement Ltd. (Febuary 2013 to 12January 2014)
5)-Working in 2*270Mw (M/S Adhunik Power & Natural Resources Ltd. Padampur, Dist. Saraikela Kharsawan (Jharkhand) .M.P. SUPER THERMAL POWER PLANT(2*270 MW PHASE-1)
(December 2012 to Febuary 2013 )
6)-Working in 8*135Mw (Raj West Power Ltd.Barmer Rajasthan)
(August 2011 to December 2012)



WORKING AREAS

1*67.5mw Power Plant & Blower House at Visakhapatnam Steel Plant, Visakhapatnam(A.P.)
Client M/S RASHTRIYA ISPAT NIGAM LIMITED (VIZAG STEEL PLANT)
Consultant M.N.DUSTUR.CO (P) LIMITED
 LT & HT panels Testing done with strong contractual Testing Agency.
 No-load trial run of drives related with Ash Handling system.
 Extensive lighting job in Ash handling plant like compressor room, Mcc room, Silo area etc.
 Experiences in construction management & report making, delay analysis, making of catch-up schedule/make-up plan, excellent customer handling capability and Quality assurance etc.
 Routine maintenance of PD PUMP.ESP Ash Vessel & Ash unloading system of ash handling system.
 Operation of Hp, Lp Pump, Slurry pump, Seal Pump, Eco booster Pump,
 Routine Operation & Maintenance of BOTTOM ASH SYSTEM, ECONOMISER.
 Control room operation in ash handling system.
Working in 2*250MW (M/S Uttar Pradesh Rajya Vidut Utpadan Nigam Ltd. Kashimpur, Aligarh (U.P.) Client Ultra Tech Cement Ltd. & J.P. Cement Ltd.(Febuary 2013 to January 2014)
 Operation and Maintenance (O&M) of Ash handling System.
 Controlling the work of Electrical and monitoring of planned preventive Maintenance.
 Repair & adjust equipment, machines and defective components.
 Positioning & installing electrical switchboard.
 Installing, testing & commissioning of various field instruments & Process control system.
 Equally responsible to attending the Breakdowns & carrying out the
Troubleshooting of electronic, pneumatic & control system.
 Read electrical, architectural & mechanical dig., drawings & specifications to determine job requirements & Plan the Layout of wiring systems.
Working in 2*270Mw (M/S Adhunik Power & Natural Resources Ltd. Padampur, Dist. Saraikela Kharsawan (Jharkhand) .M.P. SUPER THERMAL POWER PLANT(2*270 MW PHASE-1)
 Operation and Maintenance (O&M) of VACUUM SYSTEM in Ash Handling Plant. Operation and maintenance of Ash Handling System Unit # 01 in 2X270 MW TPP M/S Adhunik power & Natural Resource Ltd. Padampur ,Distt. Saraikela Kharsawan(Jharkhand)
 Routine Operation & Maintenance of BOTTOM ASH SYSTEM, ECONOMISER.
 Control room operation in ash handling system.
 Routine Operation and maintenance of cross over valve, inlet, vent, balancing outlet dome valve.
 Operation of Hp, Lp Pump, Slurry pump, Seal Pump, Eco booster Pump, Vacuums pump, Over flow pump.


VOCATIONAL TRAINING


4 Weeks vocational training from “33 K.V. SUBSTATION PARICHHA THERMAL POWER PROJECT COLONY ” JHANSI.
EDUCATIONAL QUALIFICATION
Technical Qualification:

 Diploma in 1st year Electrical Engg. with 66.6 % marks from BTEUP Lucknow in year 2009.
 2nd year Electrical Engg. with 67.7% marks from BTEUP Lucknow in year 2010
 Final year Electrical Engg.with 73.50% marks from BTEUP Lucknow in year 2011



Academic qualification:

 Intermediate passed from U.P Board in year 2003.
 High School passed from U.P Board in year 2000.



STRENGTH

 Attractive Personality
 Soft Spoken
 Good Communication
 Hard Working


PERSONAL DETAILS

Father’s Name :- Shri Mahendra Prasad
Date of Birth :- 05-01-1985
Permanent : EWS 4059 avas vikas 3,panki road kalyanpur,
Address Kanpur-208017
Present Add. :- Dhariwal ThermalPower Plant Tadali Midc
Chandrapur ,Maharashtra

Marital Status: - Married
Nationality : Indian
Language :- Hindi, English
Gender :- Male


DECLARATION

I hereby certify that the information given above is correct and true to the best of my knowledge and belief.