21-10-2014, 12:18 PM
Abstracts: In Himmatnagar city, Khed-tasiya road has been selected as a project work. Some Problems during monsoon season, like road may be damage due to accumulation of rain water, surface damage of road due to accumulation of rain water, difficulty in transportation of vehicle in traffic area and accidents are occur. The above problems can be providing separate drainage system for rain-water and drainage line. For solving this problem, we are going to survey local area, we all prepare a contour map, collection rainfall data, calculate runoff, selection of pipe material, design storm water pipe line, calculate pipe diameter and length, and installation of manhole and storm water.