Seminar Topics & Project Ideas On Computer Science Electronics Electrical Mechanical Engineering Civil MBA Medicine Nursing Science Physics Mathematics Chemistry ppt pdf doc presentation downloads and Abstract

Full Version: Work Process Management
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
[attachment=4990]
Work Process Management

Project Description


The system, which was developed now, makes this process of scheduling much easier and computerized. By this system the manager or top level designated employee can fix the schedule of any employee working under him, he even can check whether the employee is free in the particular time or in other times. Thus the top level management can easily fix the process of scheduling, and even can change the appointment which is reflected immediately to the related employee avoiding direct contact of the employee resulting in saving lot of time and work overhead.

The system even has the option for only viewing the employee’s activities or appointments. This feature avoids direct contact to the respective employee’s database and activities. There is an option where only the supervisor (the top-level manager) can have direct access to the employee’s activities, he can change the appointments of the employees working under him. No other employee of the same designation or same level of hierarchy can do this.