Seminar Topics & Project Ideas On Computer Science Electronics Electrical Mechanical Engineering Civil MBA Medicine Nursing Science Physics Mathematics Chemistry ppt pdf doc presentation downloads and Abstract

Full Version: Sample Resume
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
ILLA VENKATA RAVI KUMAR
Mobile: 7752018213, 9849816223 E-Mail: ravi_bujjiin[at]yahoo.co.in,ivravikumar[at]yahoo.com

In quest of Middle level assignments development with an organization of high repute in any Industry.
Seeking middlelevel position in Maintenance, Project Management with leading organization.
Location Preference: South India

PROFESSIONAL PROFILE

 A B.Tech. in Mechanical Engineeringwithover 8 years of experience in Mechanical maintenance, Execution of projects and AutoCAD 2D and3D dwgs, SAP–PM plant maintenance.

 Well versed with Conveyor system;actively involved in project and maintenace activities.

 Exposure in implementing cost saving measures to achieve reduction in terms of procurement cost.

 Possess experience in equipment break down and to make the facility ready in minimal time for production.

 Handling the SAP PM module.

ORGANIZATIONAL PROFILE

Since 1stFEBRUARY 2012
Jindal Steel and Power Ltd.Raigarh.
Asst Manager

Roles and Responsibilities:

From JAN 2014 on wards handling theStructural project of pellet plant barbil, orissa.

Worked as Asst Mgr in Blast Furnace, Mechanical maintenance dept ,at JINDAL STEEL AND POWER LTD Raigarh dist,

• Knowledge about functional locations of a Blast Furnace such as Conveyor belts, Water system, Dedusting system, Gas Cleaning Plant.
• Actively involved in maintenace activities of all the above areas.
• Respond to equipment break down and to make the facility ready in minimal time for production.
• Maintenance of EOT CRANES.
• Maintaining record of maintenance jobs done daily.
• Scheduling man power according to the jobs.
• Handling the contractors.
• Knowledge about SAP PM Module.
• Having konwledge in Auto cad 2D and 3D modelling in all type of drawings.

Highlights:-

 Implemented KAIZENS effectively.
 Implemented SOPS
 Implemented Safe work


Previous Assignment
23/3/2010-30/1/2012 2010, March- 2012, Jan

Worked Sr Engineer in SAROJINI FERRO ALLOYS PVT LTD AP.

Key Roles and Responsibilities handled:

• Client M/S ABHIJEET FEEROTECH LTD,8x22.5mva Atchutapuram Visakhapatnam.
• Handling the contractors planning and scheduling of site construction jobs,
• Arrangement and coordination for site material requirements, Fabrication, erection & commissioning of structural jobs and Conveyor belts.
• Work men engage using all safety measures,
• Preparing all types of AutoCAD drawings in 3D and drafting in 2D dimensional.
• Check list of drawings, parts detailing of drawings,
• plate cutting requisition,
• Preparing detail drawings, preparation of part wise check list,
• Calculation the bill of material,

Highlights

 Modified the design according the site works.
 Handling the manpower without any failure.
 Successfully handled all the projects drawings.


Previous Assignment
24/6/2006-20/3/2010 2006, June- 2010,March

 Worked inK.S.ENGINEERING works at Visakhapatnamsteel plant, (24/6/2006-20/3/2010)

Responsibilities:-
• Handling the team of 2 supervisors with 26member of technical pupil.
• Mechanical maintenance jobs in raw material handling system and water pipeline.
• Maintenance schedules,
• Responsible for maintenance and troubleshooting and repair of conveyor belts
• Job duties also include the purchasing fabrication material.
• Handled all the type of AutoCAD drawings in two dimensional and three dimensional
• Responsible for paper work.

 Worked in MAA MAHAMAYA MINI INTEGRATEDSTEEL PLANT PVT LTD,
Located at Visakhapatnam, near kothavalasa. (5/6/2005-14/6/2006).

Responsibilities:-
• Worked as a Trainee engineer in Raw material handling system.
• Planning and scheduling of site construction jobs,
• Arrangement and coordination for site material requirements, fabrication, and structural jobs commissioning,
• Calculation of bill material.
• Drafted all drawings and modification in Auto cad,
• Check list and parts detailing of drawings
• Preparation of part wise check list