Seminar Topics & Project Ideas On Computer Science Electronics Electrical Mechanical Engineering Civil MBA Medicine Nursing Science Physics Mathematics Chemistry ppt pdf doc presentation downloads and Abstract

Full Version: automatic transformer distribution and load sharing system
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Hi,

Please upload the required documents for the below project

"Automatic transformer distribution and load sharing system"

Its very urgent.. Sad

Thanks & Regards,
Krishna Kumar
+918125621365
Automatic Transformer Distribution and Load Sharing system


[attachment=56045]

ABSTRACT:

Power travels from the power plant to house through an amazing system called the power distribution grid. For power to be useful in a home or business, it comes off the transmission grid and is stepped-down to the distribution grid. This may happen in several phases. The place where the conversion from "transmission" to "distribution" occurs is in a power substation. It has transformers that step transmission voltages (in the tens or hundreds of thousands of volts range) down to distribution voltages (typically less than 10,000 volts). It has a "bus" that can split the distribution power off in multiple directions. It often has circuit breakers and switches so that the substation can be disconnected from the transmission grid or separate distribution lines can be disconnected from the substation when necessary.
In this project, a slave transformer in the case of shares the load of master transformer over load and over temperature. A sensor circuit is designed to log the data from the master transformer and if it is found to be in over load condition, immediately the slave transformer will be connected in parallel to the master transformer and the load is shared.
LM324 operational amplifier is used to compare the load of the transformer with a standard load capacity. An NPN transistor is used to drive the relay.
This project uses regulated 5V, 750mA power supply. 7805 three terminal voltage regulator is used for voltage regulation. Bridge type full wave rectifier is used to rectify the ac out put of secondary of 230/12V step down transformer.

Advantages:

Automated Load Sharing by transformers
No manual errors
Fit and forget system
Highly sensitive
Low cost and reliable circuit