Seminar Topics & Project Ideas On Computer Science Electronics Electrical Mechanical Engineering Civil MBA Medicine Nursing Science Physics Mathematics Chemistry ppt pdf doc presentation downloads and Abstract

Full Version: AMARESH KUMAR SHARMA RESUME
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
AMARESH KUMAR SHARMA


[attachment=42859]

Objective:

Seeking a position in an organization where I can develop my skills and benefit the organization in achieving its goals and to serve to the best of my potential. I aim to take up a challenging job in your organisation.

Academic Credentials:

Diploma in Mechanical engineering from A.M.U.ALIGARH(U.P). Academic year 2003-06. (Aggregate 65%).
KADAMASATI U.M.BIDYALAY KHARESAR DEORIA (Aggregate 49%).

Skills:

Operating System : Windows (98,XP,vista, 20007 ) series.
Programming Languages : C Language, Auto CADD,solid works.
Application packages : MS-Office (ms word, PowerPoint, Excel, access)

Personal strengths:

Positive Thinking and qualities of flexibility and adaptability.
Highly Motivated, Committed person with Professional attitude.
Possessing a calm, relaxed approach to situations, people or events.
Troubleshooting computers abilities.
Reliable, empathizing and honest in approach
Ability to work under demanding conditions.
Problem-solving ability.

JOB PROFILE:

1. Assembly of Pressure Parts of the Boiler & Structure.
2. Erection & alignment of the pressure Parts & Structure.
3. Testing trial & commissioning of all equipments related to Boiler & its aux. parts become. After each planned survey & shutdown also.
4. Knowledge about planned survey, Main. Worked of pressure parts (like Water- wall, Economizer) and non pressure parts (, Coal pipe, etc.) C
5. Boiler piping 80 group &T.G piping, coal piping (P 91)
6. CO-ordination with contractors& Client Engineers to expedite and complete the jobs within the time period.
7. Co-ordination with other functional groups regarding interface issues. Ensuring adherence of safe work practices.8.
8. co-ordination with client and supervisory staffs regarding the procedures during the erection of equipments, proper planning in reference to the commissioning sequences, continuous work force monitoring, review the scheduled progress, and ensure all recommended procedures