Seminar Topics & Project Ideas On Computer Science Electronics Electrical Mechanical Engineering Civil MBA Medicine Nursing Science Physics Mathematics Chemistry ppt pdf doc presentation downloads and Abstract

Full Version: ADARI ADI BABU RESUME
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
ADARI ADI BABU

[attachment=43857]

Job Description:

21 Years of experience in Oil & Gas Plants. Power Plants and Steel Plants in India and Abroad also, in
ABROAD. Experienced in Preparation of Pumps alignment (Horizontals and vertical), Boll Mills
And Keliens and Stacker and Wricklamers also Compressors and Plate mills and Rolling Mills and
Turbines 30MW& 310 MW maximum completed the jobs and Extras.

EDUCATIONAL QUALIFICATION:

1). I .T.I (Industrial Training Institue).
2). S.S.C (Secondary School Certificate. Govt of Andhrapradesh, India).
3). D.M.E (Diploma Mechanical Engineering R.V.G.S Institute).

FILD OF EXPERIENCE:

Rotating Equipments: Erection, Installations, and Over oiling and Maintenance.
Such as Centrifugal pumps and Vertical Pumps and Single Stage pumps and Multistage
Pumps and Mills and Stackers and Wricklamers Erection and Alignments also as for Drawing don the equipments Installations the equipments,
Compressors –Reciprocating – Multistage – Erection- Mov and Control valves and Pistons assembles and Other Equipments also Mechanical Seals and Number of Types Seals and Cranks and Diagrams and Break Drums also Extra’s,
Gear Boxes Spur Gear Boxes and Warm Gearboxes and Helical Gear and Rim Gears and Rack and penion Gears also aliening and mechanical maintenance also doing and more type of gears also doing,

Summary of Experience in India:-

M/s. Khalathal Brother Limited Company Visakhapatnam steel plant steel casting section Denniel main company under the micco company CCM -3 project Full aelien ment & erection doing the all Equipments.
Postion Heald: - MILL WRIGHT SUPERVISOR
Duration date: - From 01-04-2011 To Still continue,
M/s. Sarita Steel Mills Limited This plant also Mills sizes 24 Inches 22 Inches 20 Inches chanel mills assembling and Erection and Leveling and Fixing the Equipments,
Postion Heald :- MILL WRIGHT FITTER
Duration date: - From 01-02-1997 To 03-12-1997,
M/s. Naha Erectors in ESSAR Project under the steel ball mill and Murd Filters discs and Fillet Plant and conver lines and Grind mill and Reciprocating pump and Id Fans and other Equipment also doing the jobs.
Postion Heald :- MILL WRIGHT FITTER
Duration date: - From 07-04-1995 To 03-05-1996,