26-12-2012, 06:41 PM
Amit Tripathi
[attachment=45355]
Objective
To work in a globally competitive environment on challenging assignments that shall yield the twin benefit of the job satisfaction and a steady –paced professional growth.
Education
1. BE (Electrical)-2009(65.71%), Modi Institute of Engineering College, affiliated from Rajasthan University, Jaipur.
2. Sr.Sec. (XII)-2005 (55.0%), Saint John Senior Secondary School, Kota, CBSE.
3. Sec.(X) -2003(62.4%), Emmanuel mission Senior Secondary School, Kota, CBSE.
Professional Training
1. Acadmic Training at Kota Super Thermal Power Station ( K.S.T.P.S.) , Kota (45days)
• Its generation power is 1240 MW.
• It consist of seven unit.
2. Academic Training at 220K.V.G.S.S. , sakatpura, Kota (30 days)
• Transmit power almost 30% in Rajasthan
• Transmit power to other states
Working Experience
• Recuited as a contract engineer by M/s INSTRUMENTATION LTD.
( Government of India Enterprises ) and working in CTPP
( Chhabra Thermal Power Plant )as an operation engineer in 250 MW unit.
• Total generating capecity 2X 250=500 MW
• Experience:One year
• Specialisation :C.A. and Electricals ,boiler ,turbine
[attachment=45355]
Objective
To work in a globally competitive environment on challenging assignments that shall yield the twin benefit of the job satisfaction and a steady –paced professional growth.
Education
1. BE (Electrical)-2009(65.71%), Modi Institute of Engineering College, affiliated from Rajasthan University, Jaipur.
2. Sr.Sec. (XII)-2005 (55.0%), Saint John Senior Secondary School, Kota, CBSE.
3. Sec.(X) -2003(62.4%), Emmanuel mission Senior Secondary School, Kota, CBSE.
Professional Training
1. Acadmic Training at Kota Super Thermal Power Station ( K.S.T.P.S.) , Kota (45days)
• Its generation power is 1240 MW.
• It consist of seven unit.
2. Academic Training at 220K.V.G.S.S. , sakatpura, Kota (30 days)
• Transmit power almost 30% in Rajasthan
• Transmit power to other states
Working Experience
• Recuited as a contract engineer by M/s INSTRUMENTATION LTD.
( Government of India Enterprises ) and working in CTPP
( Chhabra Thermal Power Plant )as an operation engineer in 250 MW unit.
• Total generating capecity 2X 250=500 MW
• Experience:One year
• Specialisation :C.A. and Electricals ,boiler ,turbine