Seminar Topics & Project Ideas On Computer Science Electronics Electrical Mechanical Engineering Civil MBA Medicine Nursing Science Physics Mathematics Chemistry ppt pdf doc presentation downloads and Abstract

Full Version: SAYED AHAMMAD RESUME
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
SAYED AHAMMAD

[attachment=46193]

PROFESSIONAL ABRIDGEMENT

A competent Professional with nearly 2-years 5months till in company experience in Instrumentation and Installation & Pre-Commissioning, Expertise in instrumentation, erection testing & commissioning of wide range of plant instruments, Proficient in managing & leading teams for running successful process operations & experience of developing procedures, service standards for operational excellence, knowledge of Calibration in the Field Instruments (Pressure Gauges, Temperature Gauges, Pressure Transmitters, Differential Pressure Transmitters, Temperature Transmitter, Temperature Elements, I/ P Converters, Flow Meters, Control Valves Digital temp. Scanners, weighing balances & Intercom Telephones, cc cameras).

ORGANISATIONAL EXPERIENCE

Since oct 2010 to 2011 sep working in Andhra Organics, pydabhimavaram, srikakulam (Dist), A.P
Jr-Executive (Electrical &instrumentation) : Maintenance in Power & Chemical plant
- 1x30 TPH CVL make AFBC boiler
- 1x3.5 MW Siemens Back pressure turbine.
Since oct 2011 to april 2012 with Deepak steel & power corp. Ltd, Barbil (Orissa).
Asst.Engineer (Instrumentation): Erection - Commissioning & Maintenance.
- 1x38 TPH Thermax make WHR boiler.
- 1x45 TPH Thermax make AFBC boiler.
- 1x20 MW Siemens extraction/condensing turbine.
Operating system: ROCKWELL AUTOMATION.
Since april2012to Nov2012 with till in Janaki corp. Ltd, Bellary (Karnataka), Under the O&M of khyathi Engineering & Technical Services
Asst.Engineer (Instrumentation): Erection - Commissioning & Maintenance.
- 6x10.5 TPH Thermax make WHR boiler.
- 1x30 TPH CVL make AFBC boiler.
- 1x16 MW Siemens extraction/condensing turbine.
Operating system: ABB
- 1x12 MW Triveni extraction / condensing turbine.
Operating system: yokogawa CS 1000.

Accountabilities

Instrumentation
Developing standards for Instrumentation Department for various parameters.
Managing the process measurement, control instrumentation and services to monitor record & optimize plant productions.
Understanding P&ID, Process Flow Diagrams..
Managing erection & pre-commissioning of entire Field instruments & Trials for the Motors.

Installation & Pre Commissioning

Managing installation and Pre commissioning as well as conducting tests & inspections to ensure operational effectiveness of utilities.
Handling fault finding and commissioning of plant instrumentation.
Assisting in the instrumentation & electrical operations in Boiler ESP Ash handling system.
Assisting in the erection of DCS Panels.