Seminar Topics & Project Ideas On Computer Science Electronics Electrical Mechanical Engineering Civil MBA Medicine Nursing Science Physics Mathematics Chemistry ppt pdf doc presentation downloads and Abstract

Full Version: Arun Kumar
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Arun Kumar

[attachment=46806]


Summary:-

Knowledge about manufacturing process.
CNC turning, CNC grinding, cylindrical grinding, Polishing, super finishing, arch welding, TIG, MIG welding.
ISO-TS Implementation, Production management & quality management.
Educational Qualification:-
• B.Tech in Mechanical Engineering from NIT.
• Higher secondary in March 1998.
• High school in 1996.

Professional Experience:-

#Company : - M/s Panasonic India Pvt. Ltd.
About Company: - M/s Panasonic India Pvt. Is the Japanese concern having product AIR-CON.
Designation : - Executive PPC.
Duration : - Feb 2012 till date.
Two Months training abroad in Malaysia Panasonic.
#Company: - M/s Motherson Summi Systems Ltd.
About Company: - M/s Motherson Summi Systems Ltd. Is an ISO/TS system automobile concern having technical collaboration with Japanese concern M/s Summi Tomo. This company is manufacturing WIRING HARNES for Maruti, ITL, Mahindra & Honda Scooter etc.This is having annual turnover around 600 USD.
Designation : - Sr. Engineer PPC.
Duration : - April 2008 to Jan 2012.
#Company: - M/s Parishudh Machines Pvt. Ltd.
About Company: - M/s Parishudh Machines Pvt. Ltd. Is an ISO/TS system automobile concern. This company is manufacturing CAM SHAFTS, CRANK SHAFT, SHAFTS, GEAR BLANKS, GEAR for Swaraj Tracter,ITL, Kinetic ,Denso,Preet Tractor etc.
Designation : - Engineer in Production & PPC.
Duration : - From Jan 2004 to Feb 2006 as engineer production. From Feb 2006 to April 2008 on PPC.

Job profile:-
• Schedule receiving from marketing in N month for N+1 month production.
• On the basis of closing stock month WIP for each plant area making the net production plan named MPS.
• Making the production plan (Monthly, Weekly & daily) based on plant resources capacity & DELIVEY DATE.
• Weekly material planning based on the production plan.
• Intimation to HRM for manpower requirement.
• Making the conveyers & machines loading plan based on requirement & infra capacity.
• Intimation of production plan (monthly, weekly, daily) to all concerns.
• Daily production progress monitoring & analysis with plant team in morning meeting.
• Tracking & rectifying the line stoppages & material shortages.
• Daily dispatches handling & coordination with the transport.
• Facing all ISO\TS audits.
• Member of APQP projects & consideration of new projects in monthly production plan.
• Every month taking WIP in FG & punching in systems.
• FG warehouse manpower scheduling & controlling.
• FG warehouse resources planning & monitoring.