19-04-2014, 03:27 PM
IMPORTANCE OF COMPUTERIZED BANK MANAGEMENT SYSTEM
COMPUTERIZED BANK .docx (Size: 13.97 KB / Downloads: 13)
INTRODUCTION
During the past several decades personnel function has been transformed from a relatively obscure record keeping staff to central and top level management function. There are many factors that have influenced this transformation like technological advances, professionalism, and general recognition of human beings as most important resources.
A computer based management system is designed to handle all the primary information required to calculate monthly statements of customer account which include monthly statement of any month. Separate database is maintained to handle all the details required for the correct statement calculation and generation.
This project intends to introduce more user friendliness in the various activities such as record updation, maintenance, and searching. The searching of record has been made quite simple as all the details of the customer can be obtained by simply keying in the identification or account number of that customer. Similarly, record maintenance and updation can also be accomplished by using the account number with all the details being automatically generated. These details are also being promptly automatically updated in the master file thus keeping the record absolutely up-to-date.
The entire information has maintained in the database or Files and whoever wants to retrieve can’t retrieve, only authorization user can retrieve the necessary information which can be easily be accessible from the file.
FEASIBILITY STUDY
The feasibility study proposes one or more conceptual solution to the problem set of the project. In fact, it is an evaluation of whether it is worthwhile to proceed with project or not.
Feasibility analysis usually considers a number of project alternatives, one that is chosen as the most satisfactory solution. These alternatives also need to be evaluated in a broad way without committing too many resources. Various steps involved in feasibility analysis are:
1. To propose a set of solution that can realize the project goal. These solutions are usually descriptions of what the new system should look like.
2. Evaluation of feasibility of such solutions. Such evaluation often indicates shortcomings in the initial goals. This step is repeated as the goals are adjusted and the alternative solutions are evaluated.
Transaction System:
A transaction is a record of some well-defined single and usually small occurrence in a system. Transactions are input into the computer to update the database files. It checks the entering data for its accuracy. This means that numeric data appears in numeric field and character data in character field. Once all the checks are made, transaction is used to update the database. Transaction can be inputted in on-line mode or batch mode. In on-line mode, transactions are entered and updated into the database almost instantaneously. In batch mode, transactions are collected into batches, which may be held for a while and inputted later.
Decision Support System:
It assists the user to make analytical decision. It shows the various data in organized way called analysis. This analysis can be made to syrdy preferences and help in making decisions.
Computer system works out best with record maintenance. It will tell you which customer would get how much pending/reports statements. It will also help to search the information about a particular person by simply entering his telephone number.
User can store information as per requirement, which can be used for comparison with other reports.
ABOUT PROJECT TECHNICAL
DOCUMENT
The basic objective of Bank Management System is to generalize and simplify the day to day or activities of Company like New Account opening, Daily transaction, Report/Statements etc. which has to be performed repeatedly on regular basis. To provide efficient, fast, reliable and user-friendly system is the basic motto behind this exercise.
A bank is a primer body is sources of money storage where we can deposit the money when we not much needed and can withdraw whenever require. In Bank, we can issue cheque or draft, which are other way of transferring the money from one source to other.
System Design
The design document that we will develop during this phase is the blueprint of the software. It describes how the solution to the customer problem is to be built. Since solution to complex problems isn’t usually found in the first try, iterations are most likely required. This is true for software design as well. For this reason, any design strategy, design method, or design language must be flexible and must easily accommodate changes due to iterations in the design . Any technique or design needs to support and guide the partitioning process in such a way that the resulting sub-problems are as independent as possible from each other and can be combined easily for the solution to the overall problem. Sub-problem independence and easy combination of their solutions reduces the complexity of the problem. This is the objective of the partitioning process.