13-10-2012, 12:34 PM
PROJECT REPORT ON RAILWAY RESERVATION SYSTEM
RAILWAY RESERVATION Report.doc (Size: 2.45 MB / Downloads: 145)
ABSTRACT OF THE PROJECT
As we are beginners and have no practical experience in the field of software development and moreover the RAILWAY system is very wide. So, we limit the scope of our project by computerizing the following fields of the RAILWAY system.
SYSTEM REQUIREMENTS
PRODUCT DEFINITION:
We have come to final conclusion that after analyzing the existing system of the “Solitaire Software”. We came to know that it is very difficult for the person to maintain records manually same in the case with the person that done the reservation, so in order to provide the person with such a system that helps him easy in maintaining the records of the passenger we are going with this project.
FEASIBILITY ANALYSIS:
Depending on the results of the initial investigation, the survey is expanded to a more detailed feasibility study. A feasibility study is a test of a system proposal. According to its workability, impact on the organization, ability to meet user’s needs and effective use of the resources. Main task done during the feasibility study are:-
1. Evaluation of existing system and procedures. Our group went to various Mobile shops & Mobile dealer to gather information about the software system. They are using and evaluating those system and the procedures invoked in it during the period of feasibility study.
2. Analysis of alternative candidate systems:- after studying the various systems we derived various alternatives through which we develop our project and evaluated the alternative. The most appropriate is selected.
ECONOMIC FEASIBILITY:-
The only tangible benefit provided by the proposed that the paper work is Reduced to the minimum and hence the reduction in cost incurred on Stationary and its storage. The system provide many benefits that can’t be measured in terms of Money for e.g. user’s friendliness, more user response being more efficient.