30-10-2014, 03:00 PM
Abstracts: The long production operation is challenge for small scale sheet metal industry. ” Locking device of electrical panel module” of sheet metal product, the productivity can be increased with the help of special die. The objective of this project is to obtain better productivity, reduce the processing operations, minimize the machining time. This study focuses on applying better production method to minimize the operations. So we suggested using of four die for reducing the production operations and improving the productivity. Hence the profit of the company can be increased.