28-12-2012, 01:31 PM
Non-Traditional Machining
(PTB43002)
1Non-Traditional.docx (Size: 4.58 MB / Downloads: 51)
EDM Die Sinking Start up Process
1. Turn on isolator switch
2. Turn on stabilizer switch
3. Turn on air pneumatic pump (6 Bar) – Release the water
4. Turn on cooler switch
5. Release emergency button - panel
6. Switch on control panel and push ready button (Green)
7. Put work piece on the table and on magnetic chuck
8. Set origin
EDM Wire Cut Start up process
1. Turn on isolator switch
2. Turn on stabilizer controller
3. Turn on automatic voltage regulator
4. Turn on air pump and release the water
5. Turn power on
6. Release emergency stop button
7. Press ready button
8. Home reference point
Setting Datum on work piece
1. Bring nozzle to centre
2. Press button for wire insert – step( press button maintenance , press M1 and press M2 for seeing feeding wire diagram)
3. Work piece setup
Hole Positioning
1. Press button (2x) - 1x for edge and 2x for hole(can see at screen)
2. After finish process
3. Press button reset twice (2x)
4. Setting (X : 0, Y:0,Z:0,U:0 and V:0)
5. Press ready so nozzle will go to datum (0,0)