Introduction
A Live project “Travel & Tour Management System”, a result of my Industrial training in final sem
A project with high demand in ongoing systems of tourism and travel agency
A web based application system with high flexibility from user and viewer perspective
Project Description
Travel & Tour Package Booking system
A project on Asp.Net platform with heavy database of SQL server increasing the power of the app
Architecture Design
The architecture of the Travel & Tour Management System project follows the three-tier architecture.
Architecture Design
The Architecture Design of the Travel & Tour Management System follows the three-tier architecture.
1. Presentation Tier
2. Business Logic Tier
3. Database Tier
The architecture design of the Travel & Tour Management has been represented with the help of the Class Diagram and the Sequence Diagram.
Technologies Used
Asp.Net 4.0 as framework
SQL Server 2008 as database
C# as the programming language
HTML as front end scripting
CSS for look and feel
IIS as hosting server
Class Diagram
Page Flow Diagram for User
Page flow diagram continued..
Page flow diagram continued..
Formal Requirements Specification
Each customer should have a unique userid
Each employee should have a unique userid
No two hotels can have the same hotel number.
Hotel has multiple rooms
Formal Requirements Specification continued..
class User
attributes
userid: string
password: string
emailid: string
name: string
loginstatus : Boolean
operations
VerifyLogin(email : string , password : string) : Boolean = user.allInstances -> exists (u: user | u.emailid = emailid and u.password = password)
end
Test Plan
The main purpose of the test plan for the Travel & Tour package booking system is to discuss the testing details of the use cases of the Travel & Tour package booking system. The software project test plan also describes the objective, scope and approach of the software testing effort for the Travel & Tour package booking system project.
Test Plan continued..
The main objectives of the test plan are as follows:
To identify the features of the system that will be tested.
To identify and define all the activities necessary to prepare for and conduct the testing process on the Travel & Tour package booking system
To define the pass/fail criteria for each item that will be tested
To identify the deliverables of the testing phase.
To define any suspension criteria and resumption techniques
To discuss the testing techniques being used to test the Travel & Tour package booking system
Test Plan continued..
The different types of testing are:
Unit Testing : The Unit Testing is a test that tests each single module of the software to check for errors. This is mainly done to discover errors in the code of the Travel & Tour package booking system. The main goal of the unit testing would be to isolate each part of the program and to check the correctness of the code.
System Testing: The system testing is mainly done on the whole integrated system to make sure that the project that has been developed meets all the requirements
Acceptance Testing: This testing is generally performed when the project is nearing its end. This test mainly qualifies the project and decides if it will be accepted by the users of the system.