Abstracts: In present time we face many problems regarding traffic. So to avoid it in many town or city there are many new bridges are constructed. Also one problem in now days to minimize the traveling time. In present study we are going to analyses one bridge which is constructed on a river Dhatarwadi in pipvav. The scope of work includes the construction of elevated structure of 15m wide and 200m long from 1165m to 1365m at pipvav. The elevated structure consist of 8 spans of 25m āIā ā girders 8 nos. girders each span. Comparative different design for pile length, intermediate spacing as possible as economical in cost and good strength for actual construction design