20-10-2014, 03:20 PM
I worked on two projects. First project involved the study of Kanban system being applied on the production line and suggesting a more strategic way in which the components should be kept in the assembly line so as to minimize the work space and time for assembly. Second project was to propose trolley design for the parts to be fed at the production line under just in sequence.