18-10-2014, 03:09 PM
The basic aim was to study the construction and testing of turbo generator (TG). I studied in detail the manufacturing of Turbo generators and various components used in Production Block -1,BHEL. Stress was given mainly on the manufacturing and maintenance of Turbo Generators. Different processes involving in construction of Turbo Generators were studied. I studied about Turbo Generator iron assembly, Turbo Generator rotor winding (how winding is housed on rotor shaft), exciter (how exciter is designed), Turbo Generator stator winding (how three phase winding is housed in slots on stator), Turbo Generator main assembly and test bed. I also studied different processes like processes related to machine shop e.g. shaping, drilling, boring, cutting etc of metal. Project In-charge: S. K. Luthra, AGM, Block-1, BHEL Haridwar.